Results
European Prize for Urban Public Space 2012
  • <br />
    Rearrangement of Ljubljanica riverbanks
    Ljubljana [Slovenia] 2011
    JOINT WINNER
     

    BEGINNING OF THE PROJECT: 2004

    BEGINNING OF WORK: 2006

    COST: 20,100,000 €

    AREA: 65,000 m2

    AUTHORS:

    Boris Podrecca, ATELIER arhitekti (Jurij Kobe, Špela Kokalj, Maja Kovačič, Urša Podlipnik, Ljuba DallaValle, Jakov Brdar, Nataša Blažko, Tanja (Bojc) Paulin, Tomaž Habič), BB ARHITEKTI (Breda Bizjak), ATELJE VOZLIČ (Vesna Vozlič Košir, Matej Vozlič), DANS arhitekti (Miha Dešman, Katarina Pirkmajer Dešman, Eva Fišer Berlot), TRIJE arhitekti (Andrej Mercina, Ksenija Intihar, Nina Juratovec, Nika Svetina), MEDPROSTOR (Jerneja Fischer Knap, Rok Žnidaršič, Samo Mlakar), URBI (Saša Dalla Valle, Tea Fink)

    DEVELOPER:

    Mestna občina Ljubljana, Turizem Ljubljana, Javno podjetje Energetika, d.o.o., Kranjska investicijska družba, d.o.o.

  •  

    BEGINNING OF THE PROJECT: 2009

    BEGINNING OF WORK: 2010

    COST: 968,332 €

    AREA: 9,611 m2

    AUTHORS:

    Jansana, de la Villa, de Paauw arquitectes SLP, AAUP Jordi Romero i associats SLP

    DEVELOPER:

    Agència de Promoció del Carmel i Entorns S.A.

  •  
    "Shared Surface" in Exhibition Road
    London [United Kingdom] 2011
    SPECIAL MENTION
     

    BEGINNING OF THE PROJECT: 2009

    BEGINNING OF WORK: 2011

    COST: 25,000,000 €

    AREA: 26,000 m2

    AUTHORS:

    Royal Borough of Kensington and Chelsea

    DEVELOPER:

    Dixon Jones Ltd

  •  
    Memorial to the abolition of slavery
    Nantes [France] 2011
    SPECIAL MENTION
     

    BEGINNING OF THE PROJECT: 2003

    BEGINNING OF WORK: 2010

    COST: 7,500,000 €

    AREA: 8,500 m2

    AUTHORS:

    Krzysztof Wodiczko & Julian Bonder Krzysztof Wodiczko & Julian Bonder. Wodiczko+Bonder, Architecture, Art & Design

    DEVELOPER:

    Nantes Metropole, Ville de Nantes

  •  
    Elsewhere
    Malmö [Sweden] 2010
    SPECIAL MENTION
     

    BEGINNING OF THE PROJECT: 2004

    BEGINNING OF WORK: 2006

    COST: 950,000 €

    AREA: 4,500 m2

    AUTHORS:

    Tania Ruiz

    DEVELOPER:

    Trafikverket, Statens konstråd, Informationsteknik Malmö

  •  
    "Occupy Puerta del Sol"
    Madrid [Spain] 2011
    SPECIAL CATEGORY
     

    BEGINNING OF THE PROJECT: 2011

    BEGINNING OF WORK: 2011

    AREA: 10,000 m2

  •  
    Fallen firemen memorial
    Murter-Kornati [Croatia] 2010
    FINALIST
     

    BEGINNING OF THE PROJECT: 2010

    BEGINNING OF WORK: 2010

    COST: 240,000 €

    AREA: 48,500 m2

    AUTHORS:

    Nikola Bašić

    DEVELOPER:

    Šibensko-kninska županija

  • The shelter fits into the sound Mediterranean tradition of protecting foodstuffs from sun and rain by means of high ceilings that lift off the hot rising air while inviting transversal ventilation that cools these spaces.<br />
    Photovoltaic Canopy
    Figueres [Spain] 2011
    FINALIST
     

    BEGINNING OF THE PROJECT: 2009

    BEGINNING OF WORK: 2010

    COST: 2,077,400 €

    AREA: 1,713 m2

    AUTHORS:

    Rafael de Cáceres & Xavier de Cáceres

    DEVELOPER:

    Ajuntament de Figueres

  • The project as a whole was planned around a large central meadow, crossed from east to west by a concrete footpath and from north to south by a pair of railway lines.<br />
    Park am Gleisdreieck
    Berlin [Germany] 2011
    FINALIST
     

    BEGINNING OF THE PROJECT: 2006

    BEGINNING OF WORK: 2007

    COST: 15,000,000 €

    AREA: 400,000 m2

    AUTHORS:

    Atelier Loidl Landscape Architects

    DEVELOPER:

    Land Berlin, vertreten durch Grün Berlin GmbH

  • From the lower level of passengers coming out of the Metro, the ceiling becomes a reflecting surface that announces their coming encounter with the waters of the Tagus.<br />
    Sea Level
    Lisbon [Portugal] 2011
    FINALIST
     

    BEGINNING OF THE PROJECT: 2006

    BEGINNING OF WORK: 2010

    COST: 1,100,000 €

    AREA: 1,000 m2

    AUTHORS:

    Catarina Almada Negreiros, Rita Almada Negreiros, Atelier Daciano da Costa

    DEVELOPER:

    Metropolitano de Lisboa

  •  

    BEGINNING OF THE PROJECT: 2007

    BEGINNING OF WORK: 2010

    COST: 1,526,460 €

    AREA: 5,257 m2

    AUTHORS:

    Jaime J. Ferrer Forés

    DEVELOPER:

    Patronat Municipal de l'Habitatge, Ajuntament de Palma

  • Inverting the usual trend of introducing small garden plots and parterres as exceptional points in the hard surface of the ground, paving and steps are the singular features that break with the general rule here, a carefully dosed resource that is used only when the relationship between land and humans makes it essential.<br />
    Three Squares
    Oliana [Spain] 2010
    FINALIST
     

    BEGINNING OF THE PROJECT: 2007

    BEGINNING OF WORK: 2009

    COST: 237,818 €

    AREA: 1,624 m2

    DEVELOPER:

    Marc Manzano Saló Generalitat de Catalunya - Departament de Territori i Sostenibilitat, Incasòl, Ajuntament d’Oliana

    AUTHORS:

    Joaquín Pérez Sánchez, Eva Girona Cabré

  • <br />
    Zarasai review wheel
    Zarasai [Lithuania] 2011
    FINALIST
     

    BEGINNING OF THE PROJECT: 2008

    BEGINNING OF WORK: 2010

    COST: 600,000 €

    AREA: 12,800 m2

    AUTHORS:

    Sarunas Kiaune

    DEVELOPER:

    Zarasu rajono savivaldybe

  • Aerial view of the main square of Almazán. The aim was to improve the square’s visual relationship with the Duero basin and to facilitate and clearly indicate access to the lower riverside road.<br />
    Cantilever Balcony&Main Square
    Almazán [Spain] 2011
    FINALIST
     

    BEGINNING OF THE PROJECT: 2008

    BEGINNING OF WORK: 2010

    COST: 2,453,000 €

    AREA: 6,900 m2

    AUTHORS:

    Churtichaga+Quadra-Salcedo Arquitectos

    DEVELOPER:

    Ministerio de Fomento, Dirección General de Vivienda, Ayuntamiento de Almazán

  • Protean in shape and cheerful in appearance, the bench of “A Place for the Community” invites people to sit down for a bite to eat or for a good long chat.<br />
    "Magic Blocks"
    Bucharest [Romania] 2010
    FINALIST
     

    BEGINNING OF THE PROJECT: 2010

    BEGINNING OF WORK: 2010

    COST: 21,000 €

    AREA: 440,000 m2

    AUTHORS:

    Zeppelin, Point 4, Studio Basar, Hackenbroich Architekten, Archis Interventions Berlin

    DEVELOPER:

    Institutul Cultural Roman - Programul Cantemir, ERSTE Stiftung

  • <br />
    "LIFT11" Urban Installations Festival
    Tallinn [Estonia] 2011
    FINALIST
     

    BEGINNING OF THE PROJECT: 2009

    BEGINNING OF WORK: 2011

    COST: 180,000 €

    AREA: 20,000 m2

    AUTHORS:

    Path In The Forest by Tetsuo Kondo Architects Path In The Forest by Tetsuo Kondo, Mitsuru Maekita, Kalarand by Toomas Paaver, Teele Pehk and Triin Talk Kalarand by Toomas Paaver, Teele Pehk and Triin Talk, The Pier by Siiri Vallner and Indrek Peil The Pier by Siiri Vallner and Indrek Peil, To The Sea by Tomomi Hayashi To The Sea by Tomomi Hayashi, Chime by Juhan Rohtla, Joel Kopli and Koit Ojaliiv Chime by Juhan Rohtla, Joel Kopli and Koit Ojaliiv, O by Aet Ader, Andra Aaloe, Kaarel Künnap, Grete Soosalu and Flo Kasearu O by Aet Ader, Andra Aaloe, Kaarel Künnap, Grete Soosalu and Flo Kasearu, QUEER STICKER-COLLECTION by Anna-Stina Treumund and Jaanus Samma QUEER STICKER-COLLECTION by Anna-Stina Treumund and Jaanus Samma, Audio Tour by Kadri Klementi Audio Tour by Kadri Klementi, Girl In The Sewer by Raul Keller Girl In The Sewer by Raul Keller, Detectors by Raul Kalvo Detectors by Raul Kalvo, Soodevahe District by Timo Toots Soodevahe District by Timo Toots

    DEVELOPER:

    KAOS Architects

  • <br />
    Sacred Art Museum and España Square
    Adeje [Spain] 2011
    FINALIST
     

    BEGINNING OF THE PROJECT: 2006

    BEGINNING OF WORK: 2008

    COST: 3,755,000 €

    AREA: 5,575 m2

    AUTHORS:

    Menis Arquitectos

    DEVELOPER:

    Ayuntamiento de Adeje

  • Marktgasse Alley is cut off by the water just after it forms a stairway that doubles as tiered seating after which it turns into a small lakeside quay. On the opposite shore, some angled steps indicate the point where the alley would emerge from the water to continue on its way.
    Stassfurt Relinquishing the Old Centre
    Stassfurt [Germany] 2010
    FINALIST
     

    BEGINNING OF THE PROJECT: 2004

    BEGINNING OF WORK: 2006

    COST: 2,902,490 €

    AREA: 29,000 m2

    AUTHORS:

    Häfner / Jimenez, Büro für Landschaftsarchitektur

    DEVELOPER:

    Stadt Stassfurt

  • <br />
    Bow Riverside
    London [United Kingdom] 2011
    FINALIST
     

    BEGINNING OF THE PROJECT: 2003

    BEGINNING OF WORK: 2010

    COST: 2,900,000 €

    AREA: 5,000 m2

    AUTHORS:

    Adams & Sutherland

    DEVELOPER:

    British Waterways

  • <br />
    Metropol Parasol
    Sevilla [Spain] 2011
    FINALIST
     

    BEGINNING OF THE PROJECT: 2004

    BEGINNING OF WORK: 2005

    COST: 90,000,000 €

    AREA: 18,000 m2

    AUTHORS:

    J. Mayer H.

    DEVELOPER:

    Ayuntamiento de Sevilla and SACYR

  • <br />
    KM_Runwaypark
    Tirana [Albania] 2011
    FINALIST
     

    BEGINNING OF THE PROJECT: 2008

    BEGINNING OF WORK: 2010

    COST: 3,800,000 €

    AREA: 46,341 m2

    AUTHORS:

    Atenastudio

    DEVELOPER:

    Municipality of Tirana

  • <br />
    "The Barley Field"
    Madrid [Spain] 2010
    FINALIST
     

    BEGINNING OF THE PROJECT: 2010

    BEGINNING OF WORK: 2010

    COST: 41,900 €

    AREA: 5,500 m2

    DEVELOPER:

    EL CAMPO DE CEBADA, FRAVM [Federación Regional de Asociaciones Vecinales de Madrid], Asociación de Vecinos La Corrala, AVECLA [Asociación de Vecinos de Centro - La Latina], Área de Gobierno de Economía, Empleo y Participación Ciudadana -Ayuntamiento de Madrid-

    AUTHORS:

    EL CAMPO DE CEBADA

  • <br />
    The City Dune
    Copenhagen [Denmark] 2010
    FINALIST
     

    BEGINNING OF THE PROJECT: 2005

    BEGINNING OF WORK: 2007

    COST: 4,850,000 €

    AREA: 7,300 m2

    AUTHORS:

    SLA A/S

    DEVELOPER:

    SEB Bank & Pension

  • <br />
    "The Rope Forest"
    Copenhagen [Denmark] 2011
    FINALIST
     

    BEGINNING OF THE PROJECT: 2010

    BEGINNING OF WORK: 2010

    COST: 1,000,000 €

    AREA: 25,000 m2

    AUTHORS:

    Keinicke & Overgaard Architects / UIWE

    DEVELOPER:

    Carlsberg Ejendomme, Realdania, Københavns Kommune, Lokale & Anlægsfonden

  • <br />
    Pueblo Gallego square
    Vigo [Spain] 2010
    FINALIST
     

    BEGINNING OF THE PROJECT: 2006

    BEGINNING OF WORK: 2008

    COST: 225,000 €

    AREA: 1,950 m2

    AUTHORS:

    Irisarri + Piñera

    DEVELOPER:

    Colegio Arquitectos de Galicia